Trade shares EU–Mercosur (2023–24): EU imports minerals 30.5%, vegetables 18.9%, foods 18.3%; paper 6.8%; live animals 5%. EU exports machinery 28.2%, chemicals 25%, transport equipment 12.1%, metals 6%, plastics 5.3%.

NEOM Hydrogen 2026, 1 GW Thyssenkrupp Electrolyzer

Green Hydrogen Offtake Model, $8.4 B NEOM Air Products Deal, $280 B in…


Industrial plant interior with large cylindrical turbines, steel framework, and yellow safety railings.

Pathways Alliance Carbon Capture 2026, 400km Pipeline, Suncor

Pathways Alliance CCUS Policy Dependence, C$16.5 B Project, 50% Federal ITC,…


Infographic describing BKV's planned path to Net Zero (Scope 1-3) with three initiatives on the left and a right-side chart showing estimates and planned reductions to reach Net Zero, including CCUS-related figures around 18.7 MtCO2e and small offsets (0.53, 0.15, 0.87 MtCO2e).

BKV Corp. Carbon Capture 2026, $1.1B Occidental Deal

CCUS Sequestration-as-a-Service, BKV Corp. & Comstock JV, $85/tonne IRA Credit,…


A data center aisle with tall server racks on both sides and colorful cables overhead between ceiling trays.

Fuel Cell Energy Fuel Cell 2026, 450 MW SDCL Partnership

Fuel Cell Energy MCFC Data Center Power, 450 MW SDCL Partnership, 12.5 MW…


Table of yearly data center electricity use (TWh) and share of US total demand from 2023 to 2030; 2023: 147 TWh, 3.7%; 2030: 606 TWh, 11.7% (increasing trend).

Amazon Nuclear 2024, $650M Talen Energy Deal

SMR Data Center Projects, 960 MW Amazon Deal, 835 MW Microsoft PPA, and 6 Key…


Line chart showing total data center electricity consumption (TWh) from 2014 to 2028, with a solid historical line and a shaded future range; key points: 1.9% of US total in 2018, 4.4% in 2022, and 6.7–12% by 2028.

Oracle Nuclear 2026, $50B Amazon Partnership

SMR AI Data Center Deals, Oracle's 1 GW SMR Project, Switch's 12 GW Oklo…


Stacked bar chart showing LNG fueled vessels and carriers in operation or on order from 2016 to 2029, using green for in operation and blue for on order (trend upward).

Hapag-Lloyd LNG Dual-Fuel 2026, 30 Ships from China

Top 10 LNG-Powered Ship Orders: OOCL's $2 B Deal, CMA CGM's 6 Ships, and Market…


Industrial substation with transformers, cooling units, and yellow railings against a snowy mountain landscape in the distance.

Meta Geothermal 2026, 650 MW AES Solar PPA

Geothermal Data Centers, 1, 000 TWh Demand Surge, Meta & Equinix PPAs, and $7.8…


Map of eastern China showing planned offshore wind projects with capacity bubbles along the coast and connecting lines to major hubs.

DEC Wind 2026, 66.9 GW Guangdong vs Ørsted Reset

Offshore Wind: Top 10 China Projects, CGN's 1, 800 MW Scale, and 26 MW Turbines…


Stacked area chart of cumulative AI infrastructure investment by category from 2024 to 2035, showing AI Chips & Accelerators, Hyperscaler/Cloud Infrastructure, Colocation Data Centers, and AI Model Companies (US$ billions).

Crusoe Energy Geothermal 2026, $750M Brookfield Credit

Enhanced Geothermal Data Centers, 7 GW US Grid Gap, $750 M Crusoe Facility, and…


Privacy Preference Center