ADNOC Geothermal Strategy 2025: From Oil Wells to District Cooling Dominance
ADNOC’s Geothermal Projects: From Pilot to Commercial Scale in 2025
ADNOC has successfully transitioned its geothermal initiative from a speculative pilot to a commercially viable business line, cementing its strategy of leveraging subsurface expertise for decarbonization.
- Between 2021 and 2024, ADNOC focused on de-risking the technology by drilling and testing its first geothermal wells and launching the pilot G2COOL plant in December 2023 in partnership with Tabreed, establishing a foundational proof-of-concept.
- The strategy matured significantly in 2025, as the G2COOL plant proved its commercial value by delivering a quantifiable 10% reduction in electricity demand for cooling, shifting the focus from validation to active scaling and replication.
- By prioritizing a direct-use application like district cooling, ADNOC sidestepped the high costs of geothermal power generation, creating a pragmatic and scalable model that directly addresses the UAE’s high energy consumption for cooling.
Funding the Transition: Analyzing ADNOC’s Geothermal Investments in 2025
ADNOC’s geothermal ambitions are underpinned by a multi-billion-dollar capital allocation strategy, which has evolved to support a broader and more aggressive energy transition portfolio. This funding framework enables the company to move from single pilot projects to scalable, long-term commercial ventures.
Table: ADNOC’s Low-Carbon and Geothermal Capital Allocations
| Partner / Project | Time Frame | Details and Strategic Purpose | Source |
|---|---|---|---|
| Low-Carbon Solutions Fund | 2025 | Investment allocation was increased from an initial $15 billion to $23 billion. This expanded fund finances decarbonization projects, including the G2COOL geothermal initiative, to support the company’s Net Zero by 2045 goal. | ADNOC Carbon Capture Initiatives for 2025: Key Projects … |
| Green Financing Facility | February 21, 2025 | Secured a $3 billion green financing facility from the Japan Bank for International Cooperation (JBIC). The funds are earmarked for decarbonization and energy transition projects, explicitly including geothermal energy. | Loans for Abu Dhabi National Oil Company under GREEN … |
| XRG Investment Platform | December 3, 2024 | Launched XRG, a global investment platform with an enterprise value over $80 billion. This vehicle is designed to fund large-scale low-carbon energy and chemical projects, including future geothermal ventures. | ADNOC Launches $80+ Billion Global Investment Platform … |
| Five-Year Capital Spending | 2022 – 2026 | Board-approved a $127 billion capital spending plan, with a significant portion directed toward its low-carbon growth strategy, which encompasses the development of new energy sources like geothermal. | UAE’s ADNOC to invest $127 bln in 2022-26 as oil, gas … |
Strategic Alliances: How ADNOC’s Geothermal Partnerships Drive Growth
ADNOC has systematically built an ecosystem of operational, technical, and financial partners to de-risk its entry into geothermal energy and accelerate its path to commercialization. These collaborations are central to its strategy of pairing its internal subsurface expertise with external market and technology leaders.
Table: ADNOC’s Key Geothermal Partnerships
| Partner / Project | Time Frame | Details and Strategic Purpose | Source |
|---|---|---|---|
| Baker Hughes | August 2025 | Formed a technology partnership to identify high-temperature geothermal resources. This collaboration aims to leverage advanced technology for breakthroughs in low-carbon initiatives. | ADNOC’s 2025 Geothermal Strategy Unlocks New Energy |
| SOCAR | July 2025 | Signed a strategic collaboration agreement with the State Oil Company of the Republic of Azerbaijan to jointly explore new clean energy technologies, with a key focus on geothermal energy. | ADNOC AI Initiatives for 2025: Key Projects, Strategies and … |
| National Central Cooling Company (Tabreed) | 2023 – 2025 | The cornerstone operational partnership for ADNOC’s geothermal strategy. The joint venture developed and now operates the G2COOL district cooling plant in Masdar City, combining ADNOC’s drilling expertise with Tabreed’s cooling market leadership. | In Abu Dhabi, Tabreed produces renewable cooling |
| Masdar | 2023 – 2025 | A key strategic partner and host of the G2COOL project in Masdar City. ADNOC Drilling also has a five-year agreement with Masdar to explore investments in geothermal, uniting drilling capabilities with renewable project development. | ADNOC Drilling and Masdar agree to explore geothermal … |
| bp | May 2022 | Agreed to a broad collaboration with ADNOC and Masdar on renewable energy projects. This framework supports knowledge sharing and joint efforts in clean technologies as part of a global energy transition strategy. | Green Hydrogen & Geothermal: Next Gen Clean Tech |
Geothermal Hotspot: Why ADNOC is Centering its Strategy in the UAE
ADNOC’s geothermal strategy is geographically anchored in the UAE, specifically Abu Dhabi, to directly tackle high local energy demand and create a replicable domestic model before considering international expansion.
- From 2021 to 2024, all operational activity was concentrated in Masdar City, which served as a controlled environment to drill, test, and launch the first-of-its-kind G2COOL project, proving the concept on home ground.
- In 2025, the strategy is shifting from a single-site pilot to a nationwide blueprint. Following the success of G2COOL, ADNOC and Tabreed are now actively assessing additional sites across the UAE to scale the geothermal cooling model.
- While international partnerships with firms like Azerbaijan’s SOCAR signal future ambitions for knowledge sharing and potential cross-border projects, the immediate commercial and operational focus remains squarely on deploying the technology to decarbonize the UAE’s energy-intensive sectors.
Geothermal Cooling Tech: How ADNOC Proved Commercial Viability at Scale
ADNOC has successfully matured geothermal technology from a regional R&D concept to a commercially proven, direct-use application for district cooling, establishing a new, viable low-carbon business line.
- The 2021-2024 period was defined by technology de-risking. This phase included the drilling and successful testing of two deep geothermal wells and the construction of the G2COOL pilot plant, which validated the foundational technical approach.
- By 2025, the technology achieved commercial validation. The operational G2COOL plant uses a closed-loop system circulating 95°C water at a flow rate of 100 kg/s to power absorption chillers, achieving a proven 10% reduction in grid electricity for cooling.
- ADNOC’s decision to focus on direct-use geothermal cooling, rather than riskier and more capital-intensive power generation, represents a mature and pragmatic technology strategy that delivers immediate, measurable decarbonization benefits in a high-demand market.
SWOT Analysis: ADNOC’s Geothermal Pivot
Table: Strategic Analysis of ADNOC’s Geothermal Initiative
| SWOT Category | 2021 – 2023 | 2024 – 2025 | What Changed / Resolved / Validated |
|---|---|---|---|
| Strength | Theoretical strength in subsurface expertise and drilling capabilities from oil and gas operations. | Demonstrated and monetized subsurface expertise through the successful drilling and operation of geothermal wells for the G2COOL plant. | The launch of G2COOL in December 2023 and its successful operation into 2025 validated that ADNOC’s core competencies are directly transferable and create a competitive advantage in the geothermal sector. |
| Weakness | Limited direct experience in developing and operating renewable energy projects, particularly in a nascent field like geothermal. | Lack of in-house experience was mitigated by forming a strategic joint venture with Tabreed, a market leader in district cooling. | The successful partnership with Tabreed for the G2COOL plant resolved the experience gap, creating a proven model for combining drilling expertise with clean energy operations. |
| Opportunity | Massive, untapped market for decarbonizing cooling, which accounts for a significant portion of the UAE’s electricity consumption. | Proven commercial case for geothermal cooling with a 10% electricity reduction, opening the door for large-scale replication and expansion into adjacent applications like desalination. | The operational metrics from G2COOL in 2025 validated the commercial opportunity, moving it from a theoretical market to a proven business case with a clear path to scaling. |
| Threat | Potential competition from more established and cost-effective renewables in the UAE, particularly utility-scale solar for power generation. | Strategic focus on the niche of direct-use geothermal for cooling, avoiding direct competition with solar for electricity generation. | By carving out a commercially viable niche in district cooling, ADNOC mitigated the threat from other renewables, demonstrating a calculated strategy to play to its strengths in a less contested market segment. |
What’s Next for ADNOC Geothermal: Scaling Cooling and Eyeing Desalination
ADNOC’s critical focus for the year ahead is to aggressively scale its proven geothermal cooling model across the UAE while initiating pilot projects in the adjacent, high-value sector of water desalination.
- The immediate priority is scaling up. Following the success of the G2COOL pilot, ADNOC will likely announce new, larger geothermal district cooling projects to capitalize on the proven commercial and technical model.
- Geothermal desalination is the next logical frontier. The 95°C water temperature from its current wells is perfectly suited for low-temperature desalination, a critical need in the water-scarce UAE, signaling a clear pathway to expand its direct-use applications.
- Broader regional leadership is on the horizon. The planned workshop in September 2025 on the geothermal potential of the Arabian Peninsula indicates ADNOC’s intent to shape the regional conversation and policy, positioning itself as a leader beyond the UAE.
- Technology will accelerate growth. The increasing use of AI for subsurface modeling, a key part of ADNOC’s digital strategy, is expected to reduce exploration risks and costs, making future geothermal projects faster and more economical to develop.
Frequently Asked Questions
What is the G2COOL project and why is it important?
G2COOL is ADNOC’s pilot geothermal district cooling plant, launched in December 2023 in partnership with Tabreed. It is important because it proved the commercial viability of the technology by demonstrating a 10% reduction in electricity demand for cooling, shifting ADNOC’s strategy from testing to commercial-scale expansion in 2025.
How is ADNOC funding its geothermal expansion?
ADNOC is funding its geothermal initiatives through several large-scale capital sources, including an expanded $23 billion Low-Carbon Solutions Fund, a $3 billion green financing facility from the Japan Bank for International Cooperation (JBIC), and the $80+ billion XRG global investment platform, all of which are designed to support decarbonization and energy transition projects.
Why is ADNOC focusing on geothermal for cooling instead of generating electricity?
ADNOC is focusing on direct-use geothermal for cooling because it is a more pragmatic and scalable model that avoids the high costs and risks associated with geothermal power generation. This strategy directly addresses the UAE’s high energy consumption for cooling and allows ADNOC to secure a competitive advantage in a niche market, delivering immediate and measurable decarbonization benefits.
Who are ADNOC’s key partners in its geothermal strategy?
ADNOC’s cornerstone operational partner is Tabreed, the district cooling company with which it developed the G2COOL plant. Other strategic partners include Masdar (host of the G2COOL project), Baker Hughes for advanced technology, SOCAR (the State Oil Company of Azerbaijan) for joint exploration of clean energy, and bp for broader collaboration on renewable energy.
What are ADNOC’s future plans for its geothermal technology?
ADNOC’s immediate priority is to scale its proven geothermal cooling model by developing new, larger projects across the UAE. The company is also exploring geothermal desalination as its next logical application. In the long term, ADNOC aims to establish regional leadership and leverage AI to reduce exploration risks and costs for future projects.
Experience In-Depth, Real-Time Analysis
For just $200/year (not $200/hour). Stop wasting time with alternatives:
- Consultancies take weeks and cost thousands.
- ChatGPT and Perplexity lack depth.
- Googling wastes hours with scattered results.
Enki delivers fresh, evidence-based insights covering your market, your customers, and your competitors.
Trusted by Fortune 500 teams. Market-specific intelligence.
Explore Your Market →One-week free trial. Cancel anytime.
Related Articles
If you found this article helpful, you might also enjoy these related articles that dive deeper into similar topics and provide further insights.
- E-Methanol Market Analysis: Growth, Confidence, and Market Reality(2023-2025)
- Battery Storage Market Analysis: Growth, Confidence, and Market Reality(2023-2025)
- Carbon Engineering & DAC Market Trends 2025: Analysis
- Climeworks- From Breakout Growth to Operational Crossroads
- Climeworks 2025: DAC Market Analysis & Future Outlook
Erhan Eren
Ready to uncover market signals like these in your own clean tech niche?
Let Enki Research Assistant do the heavy lifting.
Whether you’re tracking hydrogen, fuel cells, CCUS, or next-gen batteries—Enki delivers tailored insights from global project data, fast.
Email erhan@enkiai.com for your one-week trial.

