NVIDIA Optical Interconnect 2026, $500M Ayar Labs Round

NVIDIA Optical Interconnect Investment, $4 B for Lumentum & Coherent, and 1.6 T…


Wiwynn AI & Data Center Energy 2026, $4.75B Ecolab Deal

Wiwynn Data Center Constraints, $7 B Liquid Cooling Market, 100 k W Racks, and…


SK Hynix DRAM 2026, $3.87B Indiana Packaging Plant

HBM Wafer Cannibalization: SK Hynix $14.6 B Fab, 23% DRAM Share, and NVIDIA…


Meta AI & Data Center Energy 2026, $21B Core Weave Deal

AI Data Center Power, Meta's $80 B Spend, 165% Demand Growth, and 50% of 2026…


Bar chart of kW per AI server rack by GPU generation: current GB200 120 kW, GB300 140 kW (two entries), Vera Rubin 200+ kW; 2026 Power Shelf: VR CPX 380+ kW; 2027 HVDC standalone: VR Ultra 600 kW.

NVIDIA HVDC Power 2026, $610M 2CRSi Contract

NVIDIA 800 V DC Data Center Power, 31 Partner Ecosystem with Vertiv, 1 MW…


Chart showing 800VDC penetration of new datacenter capacity from 2025 to 2030. It stacks Retrofit (orange) and Facility-level (blue) capacity, with a green penetration rate line reaching about 60–80% by 2030. Title: '800VDC penetration of new datacenter capacity'.

NVIDIA AI & Data Center Energy 2027, $65B Market, Eaton

NVIDIA 800 V DC Architecture, 94% Efficiency Target, 5% Facility Savings, and…


Line/area chart of SLB's digital revenue from 2021 to beyond 2025, showing Legacy vs. Cloud, AI & Edge with 2021–2023 actual, 2024 estimate, and 2025+ projections. Note clarifies data years.

SLB AI & Digital 2026, $2.3B Buyback, NVIDIA Alliance

SLB AI Data Center Strategy, $1 B Target with NVIDIA, $30 M Investment, and 5…


Infographic about MARA's expansion with exaion, listing investment bullets, platform metrics, and four orange strategic boxes.

EDF Nuclear 2025, €4B Op Core Data Center Project

EDF AI Grid Strategy, €4 B Op Core Project, 2 GW Capacity, and 4 Key…


Chart showing chipmaking companies ranked by projected 2026 net income; Samsung Electronics at about $155.6B, followed by SK Hynix (111.83) and Micron Technology (81.76).

NVIDIA Semiconductors 2026, $194B with TSMC

Top 10 AI Chip and Memory Companies Winning the Data Center Supply Race in……


NVIDIA data-center campus with a tall curved building displaying the NVIDIA logo, blue and green growth charts nearby, and partner logos on the left (Microsoft, Amazon, Meta, Google).

Oklo Nuclear 2026, $650M Terra Power Investment

Oklo Advanced Reactor for AI, 12 GW Switch Deal, 6.6 GW Meta Agreement, and 5…


Privacy Preference Center