Timeline of steps for installation and operation of nuclear power by 2030, showing regulatory, site, manufacturing, testing, and infrastructure phases.

Radiant Nuclear 2026, 1 MWe Kaleidos for US Air Force

Advanced Reactor Do D Programs, 8 DIU Contractors, 9 Army Bases, and 2028…


Diagram of the Data Center Value Chain, from semiconductor design and manufacturing to data center components and cloud providers, with logos per category.

Equinix Nuclear 2026, 500 MW Stellaria PPA

SMR Grid Bypass Strategy, Equinix 500 MW Oklo PPA, 3 Nuclear Pacts, and 11…


Industrial electrical substation inside a factory with large transformers, metal piping, and yellow safety catwalks seen from an elevated angle.

Equinix Nuclear 2026, 500 MW Oklo Power Purchase Pact

Equinix Advanced Reactor Pacts, 1.25 GW Nuclear Deals, a $1.6 B Stake in at…


Infographic titled 'AI NEEDS NUCLEAR' showing: 6.6 GW total nuclear, 20-year PPAs, 2.8 GW natrium, 1.2 GW OKLO SMRs, with nuclear power → data centers → AI supercomputing visual and logos at bottom (Meta, VISTRA, oklo, TerraPower).

Meta Nuclear 2026, 2.2 GW Vistra PPA for AI Supercluster

Meta Advanced Reactor Deals: 6.6 GW Procurement, Terra Power & Oklo Pacts, and…


NVIDIA data-center campus with a tall curved building displaying the NVIDIA logo, blue and green growth charts nearby, and partner logos on the left (Microsoft, Amazon, Meta, Google).

Oklo Nuclear 2026, $650M Terra Power Investment

Oklo Advanced Reactor for AI, 12 GW Switch Deal, 6.6 GW Meta Agreement, and 5…


Privacy Preference Center