AI Energy Infrastructure, 123 GW U.S. Demand by 2035, $1 T Annual Grid Investment, and 24 Pax Silica Nations (2026 to 2030)
AI Energy Demand Projects: Pax Silica’s 1, 050 TWh Challenge and Grid Modernization Imperative
The exponential growth of artificial intelligence, the central focus of the December 2025 Pax Silica initiative, has triggered an energy demand crisis that is now the primary constraint on data center deployment. The strategic conversation, which from 2022 to 2025 centered on securing semiconductor supply chains, has abruptly shifted in 2026 to securing gigawatts of power. The core mission of Pax Silica, building a resilient AI ecosystem, is no longer limited by silicon fabrication capacity but by the physical limits of global electricity generation and transmission infrastructure.
From Chip Race to Power Race
The AI industry’s focus has pivoted from chip access to power access as the true bottleneck. Before 2026, geopolitical strategy was defined by semiconductor leadership and initiatives like the CHIPS Act. Today, the “energy-for-compute” model is the central pillar of strategy, as the physical infrastructure for power cannot be deployed at the same speed as software innovation. This has created a direct confrontation between digital ambition and physical reality, a core tension driving the U.S. energy infrastructure boom in 2026.
The Scale of the Energy Deficit
The electricity demand from AI is outstripping existing grid capacity and growth forecasts. The evidence points to a systemic challenge that requires immediate, massive investment to avoid stalling the AI buildout.
- Global data center electricity consumption is projected to reach 1, 050 TWh by 2026, an amount comparable to the entire energy consumption of Japan.
- In the U.S. alone, data centers consumed 4.4% of national electricity in 2023. This figure is on track to triple by 2028, with Deloitte projecting AI-specific data center demand could surge from 4 GW to 123 GW by 2035.
- To meet 2030 climate and energy targets, the world must build more renewable capacity between 2026 and 2030 than in all prior years combined, necessitating nearly $1 trillion per year in grid investment.
Corporate Strategy Shifts to Power Acquisition
Major technology companies are now behaving like energy firms, making multi-billion-dollar investments predicated on securing power. Google’s $15.1 billion commitment to AI infrastructure in Finland was driven by the region’s abundant wind power. Similarly, Open AI’s $500 billion “Stargate Initiative” and other hyperscaler plans are forcing a power-first reassessment of AI infrastructure, where memory and compute are now secondary to energy availability.
Pax Silica Investment: $5 Trillion Directed at AI Power and Grid Infrastructure
The multi-trillion-dollar investment forecasts for AI are increasingly being channeled away from pure compute infrastructure and toward the underlying energy generation and grid systems required to power them. Financial institutions have recognized that the AI revolution cannot be financed with software-level valuations alone; it must be underwritten by hard asset investment in power plants, transmission lines, and critical mineral supply chains. This shift is evident in new capital allocation strategies and dedicated industrial funds launched in late 2025 and 2026.
JPMorgan’s $1.5 T Security Initiative
Financial institutions are mobilizing capital specifically for these strategic industries. In October 2025, JPMorgan Chase launched a $1.5 trillion “Security and Resiliency Initiative” explicitly targeting investments in sectors critical to national security, including minerals, energy, and logistics. This initiative includes a $10 billion direct investment allocation to strengthen critical mineral supply chains, a direct enabler of both semiconductor and energy hardware manufacturing.
The Trillion-Dollar AI Buildout
Forecasts for total capital expenditure are astronomical, reflecting the scale of the infrastructure required. Financial models from major institutions quantify a historic capital cycle focused on the physical layer of AI.
- JPMorgan estimates that over $5 trillion will be spent on global data center and AI infrastructure, including power, in the five years following November 2025.
- Pw C projects global investment in AI infrastructure will reach a cumulative $31.6 trillion through 2050, underscoring the long-term nature of this buildout.
- In the U.S. alone, total investment in data centers and AI infrastructure is projected to reach $10.3 trillion between 2025 and 2032.
Table: AI Infrastructure and Energy Investment Commitments (2025-2026)
| Entity / Initiative | Time Frame | Details and Strategic Purpose | Source |
|---|---|---|---|
| Pw C Global Forecast | Sep 2026 | Projects global investment in AI infrastructure will reach $31.6 trillion through 2050. | Pw C |
| Sep 2026 | Announced a $15.1 billion investment for AI infrastructure in Finland, leveraging the country’s abundant wind power resources. | CNBC | |
| U.S. Data Center Investment | Sep 2026 | Projections indicate total investment in U.S. data centers and AI infrastructure will reach $10.3 trillion from 2025 to 2032. | Wall Street Journal |
| JPMorgan Forecast | Nov 2025 | Estimates over $5 trillion will be spent on global data center and AI infrastructure, including power, in the five years post-November 2025. | Data Center Dynamics |
| Open AI “Stargate Initiative” | Feb 2025 | Intended $500 billion investment over four years in U.S. AI infrastructure, underscoring the massive capital requirements for leading-edge AI. | Empirix Partners |
| JPMorgan Security Initiative | Oct 2025 | Launched a $1.5 trillion initiative to invest in industries critical to national security, including minerals, energy, and data centers. | JPMorgan Chase |
Pax Silica Alliances: 24 Nations Target Minerals and Energy Security
The Pax Silica initiative and its critical minerals counterpart, FORGE, represent a strategic realignment where international partnerships are explicitly formed to secure the physical inputs for AI. This has expanded beyond the original semiconductor focus to encompass the entire supply chain, from rare earth elements essential for chips and magnets to the copper and lithium required for grid-scale energy storage and transmission.
FORGE Mineral Alliance
The Forum on Resource Geostrategic Engagement (FORGE), launched in February 2026 as the successor to the Minerals Security Partnership, formalizes this effort. It aims to create a preferential trade-and-investment zone to “friend-shore” mineral supply chains away from high-risk sources. The coalition includes the United States, Australia, Canada, Finland, France, Germany, India, Japan, South Korea, and the United Kingdom, among others.
Bilateral and Corporate Partnerships
This multinational framework is reinforced by direct bilateral and corporate actions. The U.S. signed a Strategic Critical Minerals Cooperation Framework with India in May 2026 to deepen cooperation in mining and processing. On the corporate front, JPMorgan is helping finance Korea Zinc’s $7.4 billion critical minerals processing project in Tennessee, a direct outcome of this strategic alignment. Power infrastructure companies like LS Electric are securing major DC power contracts to support the data center buildout within this framework.
Table: Key Pax Silica and Related Alliances
| Alliance / Agreement | Time Frame | Details and Strategic Purpose | Source |
|---|---|---|---|
| U.S. Assumes FORGE Chair | Jul 2026 | The United States took over the chairmanship of the FORGE critical minerals coalition from the Republic of Korea. | U.S. Department of State |
| U.S.-India Minerals Framework | May 2026 | Signed the Strategic Critical Minerals Cooperation Framework to deepen cooperation in mining, processing, and recycling. | U.S. Embassy in India |
| FORGE Launch | Feb 2026 | The Forum on Resource Geostrategic Engagement was launched to succeed the Minerals Security Partnership, creating a trade-and-investment zone for critical minerals. | CSIS |
| Pax Silica Initiative Launch | Dec 2025 | Inaugurated by the U.S. State Department to build a resilient, allied “trusted zone” for the entire AI technology stack. | U.S. Department of State |
Grid Infrastructure Maturity: Legacy Power Systems Challenge the 2026 AI Buildout
While AI models and semiconductor technology like that from Applied Materials are advancing exponentially, the grid infrastructure required to support them remains a critical bottleneck. The technology exists, but its deployment maturity, scale, and speed are misaligned with AI’s demand curve. The focus of technological risk has shifted from the data center to the substation, with the slow-paced modernization of the grid becoming the single greatest inhibitor to the Pax Silica vision.
The 2022-2025 Technology Focus
In the period leading up to 2026, technology maturity discussions were dominated by advancements in the digital realm. The primary concerns were centered on semiconductor fabrication, with progress measured in nanometers (e.g., the race to 3 nm nodes), advanced chip packaging, and the architectural complexity of large language models. The underlying power infrastructure was largely assumed to be a given.
The 2026 Grid Reality Check
Since the start of 2026, the conversation has been forced to confront physical reality. The maturity bottleneck is now in grid-level hardware and systems integration. This includes decade-old electrical transformer designs with manufacturing backlogs stretching over two years, cumbersome permitting processes for new high-voltage transmission lines, and the challenge of integrating intermittent renewables at massive scale. This reality is forcing utilities like Enel to accelerate grid modernization with digital twins and robotics.
Alternative Power Sources at the Forefront
The inadequacy of traditional grid expansion is bringing alternative and distributed power sources into the commercial spotlight. Technologies that were once considered niche are now being evaluated for at-scale deployment to power data centers directly. This includes a new look at the commercialization of fuel cells, as well as small modular reactors (SMRs), enhanced geothermal, and long-duration energy storage. The technological maturity of these solutions is now a matter of national strategic importance, not just commercial viability.
SWOT Analysis: Pax Silica Energy and Infrastructure Risks
The Pax Silica initiative’s strength lies in its unified geopolitical alignment and massive capital mobilization for the AI revolution. However, this strategic push confronts a critical weakness in the physical constraints of global energy infrastructure. This creates a complex dynamic of opportunities for new energy technologies and significant threats from potential execution failures, supply chain bottlenecks, and the immense challenge of grid modernization highlighted by programs like the U.S. GRIP for grid infrastructure.
Table: SWOT Analysis for Pax Silica’s Energy-for-Compute Strategy
| SWOT Category | 2022 – 2024 | 2025 – 2026 | What Changed / Resolved / Validated |
|---|---|---|---|
| Strengths | Focus on CHIPS Act and semiconductor supply chain security. Alliances built around reshoring chip manufacturing. | Broad geopolitical alignment (24+ nations) and massive capital mobilization ($5 T+ forecasts) across the entire AI stack, including minerals and energy. | The strategy expanded from a narrow chip focus to a comprehensive industrial policy, validating that semiconductors are useless without the power to run them. |
| Weaknesses | Underestimation of the power requirements for AI at scale. Assumption that grid capacity would be available. | A massive, acknowledged energy gap (1, 050 TWh global data center demand by 2026). Slow grid modernization and long lead times for energy hardware like transformers. | The primary constraint shifted from silicon to power. The weakness of legacy grid infrastructure was validated as the main bottleneck for the entire AI buildout. |
| Opportunities | Opportunities were seen in advanced semiconductor R&D and attracting fab investment. | A trillion-dollar annual market for new energy technologies (SMRs, geothermal, storage) and grid modernization. Greenfield data center development in energy-rich regions. | The energy constraint created a massive commercial opportunity for the entire energy sector, from utilities to new technology providers and companies like Cipher Mining pivoting to AI data centers. |
| Threats | Geopolitical tensions were centered on access to advanced lithography machines and Taiwan’s semiconductor industry. | Energy bottlenecks physically stalling AI growth. Geopolitical friction shifting from chip access to energy and water access for data centers. Failure to meet climate goals. | The threat profile matured from a geopolitical chip blockade to a physical, resource-based limitation on compute capacity, impacting companies from hyperscalers to AI startups like Moonshot AI. |
2027 Scenario: Will Pax Silica’s AI Ambitions Be Curtailed by Grid Capacity?
The most critical indicator for the success of the multi-trillion-dollar AI build-out in 2027 will not be semiconductor sales, but the rate of new grid-scale power generation and transmission projects achieving final investment decision. This is the longest-lead-time item and the ultimate physical constraint on the Pax Silica vision. The strategies of AI firms like Mini Max are now built around mitigating this energy cost.
- If this happens: A continued slowdown in utility-scale renewable PPA signings, further delays in SMR licensing, or persistent two-year-plus backlogs for high-voltage transformers…
- Watch this: The stock performance of regulated utilities versus hyperscalers, announcements of data center projects being “paused” or relocated due to power scarcity, and the cost of capital for new energy projects.
- These could be happening: A market bifurcation where companies with direct access to power accelerate, while others stall. Geopolitical tensions could shift from disputes over chips to competition for energy resources, skilled electrical engineers, and grid hardware manufacturing capacity.
| Company⇅ | Sector⇅ | Role and Key Contributions⇅ | Source⇅ |
|---|---|---|---|
| NVIDIA | Semiconductors / AI Systems | Dominant provider of AI GPUs (e.g., Blackwell B200) and full-stack AI systems. Collaborating with system makers like Dell, HPE, and Supermicro to build out infrastructure. | NVIDIA and Partners Build America’s AI Infrastructure and … ↗ |
| TSMC | Semiconductor Manufacturing | World's leading foundry for advanced chips. Pledged a $100 billion investment to expand manufacturing capacity in the U.S. | TSMC Intends to Expand Its Investment in the United States … ↗ |
| Microsoft, Amazon (AWS), Google (GCP) | Cloud Computing / Hyperscalers | Among the largest investors in AI data centers, collectively spending hundreds of billions on capex to build out AI cloud services. | 10 Artificial Intelligence (AI) Infrastructure Stocks to Buy for … ↗ |
| OpenAI | AI Models & Research | A key driver of compute demand. Announced the Stargate Initiative, an intended $500 billion investment over four years in U.S. AI infrastructure. | Inside 2025’s AI Infrastructure Investment Announcements ↗ |
| J.P. Morgan | Finance & Investment | Driving capital into the sector through its $1.5 trillion, ten-year Security and Resiliency Initiative. Estimates hyperscaler capex will reach $697 billion in 2026. | Powering the AI Revolution ↗ |
| Source⇅ | Region⇅ | Metric⇅ | 2024⇅ | 2026⇅ | 2027⇅ | 2035⇅ | Source⇅ |
|---|---|---|---|---|---|---|---|
| Artificial intelligence data centers could reach one percent … ↗ | Global | Electricity Use (TWh) | 118 | 239 – 295 | 340.14 * | 5724.26 * | Artificial intelligence data centers could reach one percent … ↗ |
| Global AI power consumption reaches 38GW – AI 2027 Tracker ↗ | Global | Power Consumption (GW) | 38 (Target) | Global AI power consumption reaches 38GW – AI 2027 Tracker ↗ | |||
| How AI Is Transforming Data Centers and Ramping Up … ↗ | Global | Data Center Demand (GW) | 92 | How AI Is Transforming Data Centers and Ramping Up … ↗ | |||
| Can US infrastructure keep up with the AI economy? ↗ | United States | AI Data Center Demand (GW) | 123 | Can US infrastructure keep up with the AI economy? ↗ |
| Mineral⇅ | Use in AI/Semiconductors⇅ | Supply Chain Risk / Concentration⇅ | Source⇅ |
|---|---|---|---|
| Gallium | Essential for compound semiconductors (GaAs) used in high-performance chips and AI accelerators. | U.S. is 100% import-reliant. China is the dominant producer. | Visualizing the Critical Minerals Powering the AI Boom ↗ |
| Germanium | Used in fiber-optic links for data center interconnects and in specialized semiconductors. | U.S. is 100% import-reliant. Supply is highly concentrated. | Visualizing the Critical Minerals Powering the AI Boom ↗ |
| Cobalt | Used in the computational backbone of AI, including GPUs and semiconductors. | Democratic Republic of the Congo accounted for 74% of global mine production in 2025. | Critical minerals are reshaping global trade as demand … ↗ |
| Copper | Fundamental for all electrical wiring, interconnects, and power distribution in data centers. | AI data centers could represent 2-3% of global demand by 2030. | Powering AI: The Critical Mineral Demands of Emerging … ↗ |
| Neodymium | A rare earth element used in magnets for various hardware components. | Supply chains are exposed to risk due to geopolitical concentration. | AI Needs Critical Materials, Fast! But From Where? ↗ |
| Tantalum | Used in capacitors and other components for chip production. | U.S. is 100% import-reliant. | Visualizing the Critical Minerals Powering the AI Boom ↗ |
| Date⇅ | Company / Entity⇅ | Investment Value (USD)⇅ | Location⇅ | Details⇅ | Source⇅ |
|---|---|---|---|---|---|
| Jul 16, 2026 | Taiwanese Enterprises | 250 Billion (Direct) | United States | Part of a deal secured by the Trump administration for direct investment in U.S. semiconductor and other sectors. | Trump Administration Secures an Additional $100 Billion U.S. … ↗ |
| Mar 4, 2025 | TSMC | 100 Billion | United States | Expansion of U.S. investment to include three new fabs and two advanced packaging facilities. | TSMC Intends to Expand Its Investment in the United States … ↗ |
| Dec 16, 2025 | U.S. Dept. of Commerce | 6.6 Billion | United States | Anticipated investments for a specific project under the Pax Silica Initiative. | United States Establishes the Pax Silica Initiative ↗ |
| Country⇅ | Join Date⇅ | Significance⇅ | Source⇅ |
|---|---|---|---|
| United States | Dec 2025 | Initiator and lead nation, focusing on policy, funding, and technology leadership. | US Inaugurates Pax Silica With Seven Allies ↗ |
| Japan | Dec 2025 | Key partner in advanced semiconductor materials and manufacturing equipment. | US Inaugurates Pax Silica With Seven Allies ↗ |
| Republic of Korea | Dec 2025 | Global leader in memory chips and advanced semiconductor fabrication. | US Inaugurates Pax Silica With Seven Allies ↗ |
| Singapore | Dec 2025 | Major hub for semiconductor manufacturing, data centers, and global logistics. | US Inaugurates Pax Silica With Seven Allies ↗ |
| United Kingdom | Dec 2025 | Strengths in chip design (e.g., Arm architecture) and AI research. | US Inaugurates Pax Silica With Seven Allies ↗ |
| Australia | Dec 2025 | Crucial supplier of critical minerals like lithium and rare earth elements. | US Inaugurates Pax Silica With Seven Allies ↗ |
| India | Feb 2026 | Growing role in chip packaging (OSAT) and a large talent pool for design. | United States and India Sign Pax Silica Declaration ↗ |
| United Arab Emirates | Feb 2026 | Significant capital for investment in AI infrastructure and data centers. | United States and India Sign Pax Silica Declaration ↗ |
| Qatar | Feb 2026 | Capital investor and strategic partner in energy supply for AI infrastructure. | United States and India Sign Pax Silica Declaration ↗ |
| Israel | Feb 2026 | Hub for semiconductor R&D and chip design innovation. | United States and India Sign Pax Silica Declaration ↗ |
| Finland | Jun 2026 | Expertise in technology and potential for data center development due to cool climate. | Outcomes of the Second Pax Silica Summit ↗ |
| Norway | Jun 2026 | Abundant renewable energy (hydropower) for energy-intensive data centers. | Outcomes of the Second Pax Silica Summit ↗ |
| Source⇅ | Market Segment⇅ | Region⇅ | Metric⇅ | 2025-2028 Forecast⇅ | 2030-2035 Forecast⇅ | Source⇅ |
|---|---|---|---|---|---|---|
| Can US infrastructure keep up with the AI economy? ↗ | AI Data Centers | United States | Power Demand (GW) | 123 | Can US infrastructure keep up with the AI economy? ↗ | |
| AI’s Power Requirements Under Exponential Growth ↗ | AI Data Centers | Global | Power Demand (GW) | 68 | AI’s Power Requirements Under Exponential Growth ↗ | |
| What Are the Power Requirements for AI Data Centers? ↗ | AI Data Centers | Global | Power Demand (GW) | 10 | 26 * | What Are the Power Requirements for AI Data Centers? ↗ |
| Global energy demands within the AI regulatory landscape ↗ | All Data Centers | Global | Electricity Consumption (TWh) | 1050 | Global energy demands within the AI regulatory landscape ↗ |
| Entity⇅ | Market Segment⇅ | Investment / Initiative⇅ | Announced Value (USD)⇅ | Timeframe / Target⇅ | Key Details⇅ | Source⇅ |
|---|---|---|---|---|---|---|
| JPMorgan Chase | Critical Minerals / Strategic Industries | Security and Resiliency Initiative | 1.5 Trillion (Initiative Size) / 10 Billion (Direct Investment) | Ongoing | Initiative to boost U.S. strategic industries. Appointed a critical minerals chief to oversee up to $10B in investments. | JPMorgan names critical minerals chief for $1.5T push ↗ |
| OpenAI | AI Infrastructure (Data Centers) | Stargate Initiative | 500 Billion | 4 Years | Intended investment in U.S. AI infrastructure, with $100B for initial deployment. | Inside 2025’s AI Infrastructure Investment Announcements ↗ |
| TSMC | Semiconductor Manufacturing | U.S. Fabs | 265 Billion (Total) | Ongoing | Includes an incremental $100B investment for four additional advanced fabs in the U.S. | Semiconductor Industry – U.S. Department of Commerce ↗ |
| AI Infrastructure (Data Centers) | Finland AI Infrastructure | 15.1 Billion | Tech giant's largest single investment in Europe for AI infrastructure. | Google commits $15 billion for AI infrastructure in ‘Texas of … ↗ | ||
| U.S. Government | Critical Minerals Supply | FORGE-related Projects | 30 Billion (Letters of Intent) | Ongoing | Mobilizing resources to support and de-risk projects that secure critical mineral supply chains. | 2026 Critical Minerals Ministerial – U.S. Mission to ASEAN ↗ |
| Korea Zinc | Critical Minerals Processing | Clarksville, TN Processing Project | 7.4 Billion | JPMorgan is helping to arrange financing for this major U.S.-based processing facility. | Jamie Dimon warned about America’s reliance on China. … ↗ |
| Forecast Provider⇅ | Market Segment⇅ | 2026 Forecast ($B)⇅ | 2030 Forecast ($B)⇅ | Key Details⇅ | Source⇅ |
|---|---|---|---|---|---|
| IDC | Global Semiconductor Market | 1290 | Forecasts a 52.8% surge in 2026, led by AI infrastructure. | Semiconductor Market Forecast 2026: The AI Supercycle … ↗ | |
| Deloitte | Global Semiconductor Market | 975 | Projects annual sales to accelerate to 26% growth in 2026. | 2026 Global Semiconductor Industry Outlook ↗ | |
| World Semiconductor Trade Statistics (WSTS) | Global Semiconductor Market | 760.70 | Forecasts an 8.5% global market increase in 2026. | Semiconductor Sales Surge in 2025: What It Signals for 2026 ↗ | |
| McKinsey | Global Semiconductor Market | 1000 | Expects the industry to reach $1 trillion by 2030. | The underestimated size of the semiconductor Industry ↗ |
| Initiative⇅ | Market Segment⇅ | Key Members / Partners⇅ | Launch Date⇅ | Stated Objective⇅ | Source⇅ |
|---|---|---|---|---|---|
| Pax Silica | AI Supply Chain Security | U.S.-led, includes key allies like Australia, India, and FORGE members. | Dec 2025 | Build a secure, prosperous, and innovation-driven silicon supply chain, from critical minerals and energy to chips and data centers. | Pax Silica Summit ↗ |
| FORGE (Forum on Resource Geostrategic Engagement) | Critical Minerals Supply | U.S., Australia, Belgium, Canada, Estonia, Finland, France, Germany, India, Italy, Japan, New Zealand, Norway, South Korea, Sweden, U.K. | Feb 2026 | Establish a preferential trade-and-investment zone to diversify and secure critical mineral supply chains, succeeding the Minerals Security Partnership (MSP). | FORGE — Forum on Resource Geostrategic Engagement ↗ |
| India-US Strategic Cooperation Framework | Critical Minerals Supply | India, United States | May 2026 | Deepen cooperation across the critical minerals and rare earths supply chain, including mining, processing, and recycling. | India-US Framework on “Securing of Supply in the Mining … ↗ |
Global Tech Standards Bifurcated Between Pax Silica and WAICO Blocs
The global map clearly delineates two distinct geopolitical blocs: Pax Silica (blue) and WAICO (red), with almost entirely non-overlapping memberships. North America, Europe (including the EU and its individual members), and Australia align with Pax Silica, while China leads the WAICO bloc, with minimal countries like Kazakhstan being signatories to both.
(Source: The Seconded European Standardization Expert for China project; U.S. Department of State — via The State of AI Global Governance and Its Implications for the U.S.-China Summit)
The questions your competitors are already asking
This report covers one angle of the energy constraint on AI development. The questions that matter most depend on your work.
- Data centers building their own power supply
- New grid transmission projects in the US
- US electrical transformer manufacturing capacity
- Critical mineral projects getting funding in the US
This report does not answer these. Enki Brief Pro does.
Your question, your angle, your framework. SWOT, PESTL, scenario modelling. The same niche depth, built around the decision your work actually depends on.
Run your first brief in Enki Brief Pro
Related Articles
If you found this article helpful, you might also enjoy these related articles that dive deeper into similar topics and provide further insights.
- E-Methanol Market Analysis: Growth, Confidence, and Market Reality(2023-2025)
- Battery Storage Market Analysis: Growth, Confidence, and Market Reality(2023-2025)
- Nvidia Semiconductors 2026, 35-Nation Alliance with Microsoft
- Climeworks 2025: DAC Market Analysis & Future Outlook
- Carbon Engineering & DAC Market Trends 2025: Analysis
Erhan Eren
Erhan Eren is the CEO and Co-Founder of Enki, a commercial intelligence platform for emerging technologies and infrastructure projects, backed by Equinor, Techstars, and NVIDIA. He spent almost a decade in oil and gas, first at Baker Hughes leading market intelligence, strategy, and engineering teams, then at AI startup Maana, where he spearheaded commercial strategy to acquire net new accounts including Shell, SLB, and Saudi Aramco. It was across these roles, watching teams stitch together executive briefings from scattered PDFs and Google searches, that the idea for Enki was born. Erhan holds a BS in Aeronautical Engineering from Istanbul Technical University and an MS in Mechanical and Aerospace Engineering from Illinois Institute of Technology. He has spent over 20 years at the intersection of energy, strategy, and technology, and built Enki to give professionals the clarity they need without the analyst-grade budget or timeline.