Stacked area chart showing US LNG export project capacity from 2016 to 2032, rising from 0 to about 35 bcf/d. Areas are labeled by project and status (Completed, Under construction, Approved), with project names on the right and a cumulative capacity increase over time.

AI & Data Center Energy 2026, >$200B U.S. Utilities

Top 10 Clean Energy for AI Investments: Amazon's $10 B Procurement, $602 B…


Table of yearly data center electricity use (TWh) and share of US total demand from 2023 to 2030; 2023: 147 TWh, 3.7%; 2030: 606 TWh, 11.7% (increasing trend).

Amazon Nuclear 2024, $650M Talen Energy Deal

SMR Data Center Projects, 960 MW Amazon Deal, 835 MW Microsoft PPA, and 6 Key…


Line chart showing total data center electricity consumption (TWh) from 2014 to 2028, with a solid historical line and a shaded future range; key points: 1.9% of US total in 2018, 4.4% in 2022, and 6.7–12% by 2028.

Oracle Nuclear 2026, $50B Amazon Partnership

SMR AI Data Center Deals, Oracle's 1 GW SMR Project, Switch's 12 GW Oklo…


Industrial substation with transformers, cooling units, and yellow railings against a snowy mountain landscape in the distance.

Meta Geothermal 2026, 650 MW AES Solar PPA

Geothermal Data Centers, 1, 000 TWh Demand Surge, Meta & Equinix PPAs, and $7.8…


Stacked area chart of cumulative AI infrastructure investment by category from 2024 to 2035, showing AI Chips & Accelerators, Hyperscaler/Cloud Infrastructure, Colocation Data Centers, and AI Model Companies (US$ billions).

Crusoe Energy Geothermal 2026, $750M Brookfield Credit

Enhanced Geothermal Data Centers, 7 GW US Grid Gap, $750 M Crusoe Facility, and…


Chart of data-center cooling options by power (3kW–200+ kW) with gray lower and purple upper boundaries; orange shows hybrids.

Switch Geothermal 2026, $1.7B Risk, Fervo Energy

Switch Enhanced Geothermal Strategy, 13 MW Ormat PPA, and 14 24/7 Power Deals…


Line chart of projected electricity demand (TWh) from 2010 to 2030 for Hyperscale, Colocation (Retail), and Colocation (Wholesale); wholesale and retail rise steadily, hyperscale increases sharply after 2020.

Google AI & Data Center Energy 2026, 1 GW TotalEnergies

Data Center Grid Constraints, 1, 000 TWh Demand by 2026, 40% Operational…


Infographic showing the rapid adoption trajectory for behind-the-meter data centers: 2024 at 13%, 2030 at 38%, and 2035 at 45–50%, with stacked colored layers for Fuel Cells, Reciprocating Engines, Gas Turbines, and Hybrid Systems.

Vantage Data Centers Geothermal 2026, $4.5B Liberty Deal

Enhanced Geothermal Projects, Vantage Data Centers 1 GW Liberty Energy JV, and…


Infographic showing a geothermal power plant supplying heat to an absorption chiller, which provides chilled water to a data center, with arrows indicating flow.

Meta Geothermal 2026, $462M Fervo Energy Funding

Enhanced Geothermal Projects, Meta 300 MW PPA, 2 XGS Energy and Sage Geosystems…


Bar chart of top global corporate clean-energy buyers in 2025, led by Meta and Amazon, by energy type (solar, wind, co-located, nuclear, other).

Meta Nuclear Strategy 2026: 8 TerraPower Reactors

Top 10 Advanced Reactor Strategies: Meta's 6.6 GW Deal with Terra Power & 4…


Privacy Preference Center