Google’s 2025 Nuclear Strategy: Powering the AI Boom

Google’s 2025 Nuclear Energy Strategy: Powering the AI Boom with Firm Carbon-Free Power

Industry Adoption: How Google’s Data Centers Ignited a Corporate Nuclear Renaissance

Between 2021 and 2024, Google’s pursuit of 24/7 carbon-free energy (CFE) for its data centers transitioned from a conceptual goal to a strategic crisis. The company, having already achieved 100% annual renewable energy matching, confronted the hard reality of intermittent power. As AI-driven electricity consumption surged—growing 17% in 2023 alone—it became clear that solar and wind could not alone provide the constant, reliable power needed. This period was marked by exploration into firm, dispatchable clean energy, culminating in a landmark move in October 2024: a deal with Kairos Power to explore the use of advanced Small Modular Reactors (SMRs). This initial step signaled a pivotal shift in corporate energy procurement, framing nuclear power not as a utility-scale solution, but as a strategic asset for private industry.

Beginning in 2025, Google’s strategy escalated from exploration to aggressive execution, validating nuclear as a core pillar of its energy portfolio. The company moved beyond speculative SMRs to embrace a diversified, multi-technology nuclear approach. In a game-changing move, Google partnered with NextEra Energy in October 2025 to revive the Duane Arnold nuclear plant in Iowa, demonstrating a pragmatic focus on bringing existing, large-scale capacity online quickly to power its Midwest data centers. This was complemented by forward-looking agreements, including a May 2025 partnership with Elementl Power for three new 600 MW nuclear projects and an August 2025 PPA with Kairos Power and the Tennessee Valley Authority (TVA). This rapid evolution from a single exploratory deal to a multi-gigawatt portfolio of both existing and next-generation nuclear projects underscores a new reality: for hyperscale data centers, nuclear power has moved from a theoretical option to a commercial necessity.

Table: Google’s Strategic Nuclear Power Commitments

Partner / Project Time Frame Details and Strategic Purpose Source
NextEra Energy October 2025 Landmark partnership to revive the Duane Arnold nuclear power plant in Iowa. This project is designed to provide firm, 24/7 carbon-free power directly to Google’s expanding AI data center operations in the region. Google, NextEra revive major Iowa nuclear facility as AI …
Kairos Power & Tennessee Valley Authority (TVA) August 2025 Power Purchase Agreement to offtake up to 50 MW of power from Kairos Power’s Hermes 2 advanced nuclear reactor. The power will be delivered to the TVA grid, supporting Google’s data centers in Tennessee and Alabama. Google signs first US nuclear deal for data centers
Elementl Power May 2025 Partnership to explore the development of three new nuclear power projects, each with a capacity of at least 600 MW (1,800 MW total). The goal is to provide dedicated, large-scale clean power for future data center campuses. Google Plans Three 600 MW Nuclear Projects for Data …
Kairos Power October 2024 Google’s first nuclear energy PPA, an agreement to deploy 500 MW of clean electricity from Kairos’s small modular reactors (SMRs) by 2035. This was a foundational move to integrate next-generation nuclear into its long-term CFE strategy. New nuclear clean energy agreement with Kairos Power

Geography: Pinpointing Nuclear Power for Google’s Data Center Hubs

Between 2021 and 2024, Google’s nuclear ambitions were geographically exploratory, centered entirely within the United States but without specific site commitments. The initial October 2024 deal with SMR developer Kairos Power was framed as a global-enabling strategy, but its roots were firmly in the U.S. advanced reactor ecosystem. This period established the U.S. as the testbed for Google’s nuclear strategy, laying the groundwork for future, more targeted deployments.

From 2025 onward, the geographic strategy crystallized with surgical precision around key U.S. data center hubs. The October 2025 partnership with NextEra to revive the Duane Arnold plant in Iowa directly addresses the immense power needs of Google’s Midwest operations. Similarly, the August 2025 agreement involving Kairos Power and the TVA targets the grids serving its data centers in Tennessee and Alabama. The planned 1,800 MW from Elementl Power projects are also slated for the U.S. This shift from a broad national focus to a highly regionalized deployment in the American heartland demonstrates a mature strategy. Google is no longer just buying clean energy; it is actively co-locating gigawatt-scale, firm power generation with its largest and fastest-growing data center campuses, creating localized, resilient energy ecosystems to fuel AI growth.

Technology Maturity: Google’s Shift from Nuclear R&D to Commercial Deployment

In the 2021–2024 period, Google’s approach to nuclear technology was exclusively focused on the future. The company’s sole commitment, the October 2024 deal with Kairos Power, was for Small Modular Reactors (SMRs)—a next-generation technology still in the pre-commercial and regulatory validation stage. This move represented a venture-style investment in an emerging solution, positioning Google as a de-risking partner for advanced nuclear innovation. The strategy was to bet on a future-proof technology that promised scalability and siting flexibility, even if commercial deployment was a decade away.

The period from 2025 to today marks a significant pivot toward technological pragmatism and portfolio diversification. While continuing to support SMRs through its agreements with Kairos Power and Elementl Power, Google made a decisive move into commercially proven nuclear technology. The October 2025 deal to restart the conventional, large-scale Duane Arnold plant in Iowa is a purely commercial play, not an R&D effort. It leverages existing, licensed technology to secure hundreds of megawatts of 24/7 carbon-free power on an accelerated timeline. This dual-track approach—simultaneously investing in proven, utility-scale reactors for immediate impact and next-generation SMRs for long-term scalability—validates nuclear technology as a whole. It signals that nuclear has graduated within Google’s strategy from a speculative R&D project to a bankable, commercially essential component for achieving its 2030 CFE goals.

Table: SWOT Analysis of Google’s Nuclear Energy Strategy for Data Centers

SWOT Category 2021 – 2024 2024 – 2025 What Changed / Resolved / Validated
Strength First-mover advantage in the tech sector by signing an advanced nuclear (SMR) deal with Kairos Power, establishing thought leadership in firm clean power procurement. Ability to underwrite massive projects through long-term PPAs, exemplified by reviving the Duane Arnold plant with NextEra and planning 1.8 GW with Elementl Power, de-risking capital-intensive nuclear assets for partners. The strategy evolved from a single, high-risk bet on future technology to a robust, diversified portfolio of both existing and next-gen nuclear, backed by immense capital commitments (e.g., $75B 2025 capex).
Weakness Entire strategy depended on a single, unproven technology category (SMRs) with long development timelines and significant regulatory hurdles, offering no near-term capacity. Still faces long lead times and regulatory complexity for new-build projects (Elementl Power) and potential public opposition. Reliant on a limited pool of specialized partners. The weakness of relying solely on future tech was mitigated by adding a proven, faster-to-market solution (reviving a conventional plant), though new-build timelines remain a challenge.
Opportunity Positioned to create a pioneering, replicable model for how energy-intensive industries can achieve true 24/7 decarbonization beyond intermittent renewables. Actively shaping and accelerating the nuclear energy market by serving as a key anchor customer for both reviving old plants (Duane Arnold) and financing new ones, creating a playbook for competitors like Amazon and Meta. The opportunity moved from theoretical to tangible. Google is now creating facts on the ground, financing real projects that are forcing utilities and regulators to create new frameworks for corporate nuclear procurement.
Threat The exponential growth of AI’s energy demand (data center usage grew 44% in two years) was rapidly outpacing the decade-long development cycle of SMRs, creating a near-term power deficit. Competition from other hyperscalers for the same limited nuclear projects and grid interconnections. Regulatory delays for new and restarted plants could still jeopardize the 2030 CFE goal. The immediate threat of a power deficit was directly addressed by the Duane Arnold revival. However, the threat has now shifted to execution risk and competition for a finite set of viable nuclear projects and grid access.

Forward-Looking Insights and Summary

The data from 2025 signals a clear trajectory for the year ahead: Google’s nuclear strategy will prioritize speed and scale. The most critical signal to watch is the progress on restarting the Duane Arnold plant; its successful and timely revival will serve as the definitive proof-of-concept for using existing nuclear assets to power data centers. We should expect Google to actively hunt for other opportunities to restart shuttered plants or extend the life of operating ones, as this remains the fastest path to securing hundreds of megawatts of firm, carbon-free power.

Simultaneously, the partnerships with Elementl Power and Kairos Power will move from framework agreements to concrete actions. Market actors should pay close attention to announcements of specific sites for these new-build projects and Google’s role in navigating the complex permitting process. This will test the true scalability of its “energy-first” co-location model. The next major validation point will be a nuclear partnership outside the U.S., likely in Europe or Asia, to support its international data center investments in regions like Belgium or India. As Google normalizes nuclear power as a corporate energy source, it is not just solving its own colossal power problem—it is rewriting the rules for industrial decarbonization and creating a powerful demand signal that will reshape the global energy landscape for decades to come.

Frequently Asked Questions

Why is Google investing in nuclear energy if it already uses 100% renewables?
While Google matches its annual electricity consumption with renewable energy purchases, sources like solar and wind are intermittent and cannot provide the constant, 24/7 power needed for its energy-intensive AI and data center operations. Nuclear energy provides firm, reliable, carbon-free power that closes this gap, moving Google closer to its goal of operating on 24/7 Carbon-Free Energy (CFE).

What types of nuclear technology is Google using?
Google is pursuing a diversified, multi-technology approach. This includes investing in next-generation technologies like Small Modular Reactors (SMRs) through partnerships with companies like Kairos Power, as well as leveraging existing, commercially proven technology by partnering with NextEra Energy to restart the conventional, large-scale Duane Arnold nuclear plant.

Is Google building and operating its own nuclear plants?
No, Google is not building or operating nuclear plants itself. Instead, it is acting as a crucial anchor customer. Through long-term Power Purchase Agreements (PPAs) and partnerships with energy companies like NextEra, Kairos Power, and Elementl Power, Google provides the financial certainty needed for these partners to build, revive, and operate the nuclear assets.

Where are these nuclear projects located and why?
The projects are strategically located to directly power Google’s major U.S. data center hubs. For example, the Duane Arnold plant is in Iowa to serve its Midwest operations, and the Kairos Power/TVA agreement targets the grids supplying its data centers in Tennessee and Alabama. This co-location strategy creates localized, resilient energy ecosystems for its fastest-growing facilities.

How did Google’s nuclear strategy change from its initial deal in 2024 to its plans in 2025?
The strategy evolved from exploration to aggressive commercial execution. The initial 2024 deal with Kairos Power was a long-term, exploratory bet on a single future technology (SMRs). By 2025, the strategy became far more pragmatic, adding a project to revive an existing, large-scale plant (Duane Arnold) for near-term power. This showed a shift from a purely R&D-style investment to a diversified portfolio approach that treats nuclear as a commercially essential resource.

Experience In-Depth, Real-Time Analysis

For just $200/year (not $200/hour). Stop wasting time with alternatives:

  • Consultancies take weeks and cost thousands.
  • ChatGPT and Perplexity lack depth.
  • Googling wastes hours with scattered results.

Enki delivers fresh, evidence-based insights covering your market, your customers, and your competitors.

Trusted by Fortune 500 teams. Market-specific intelligence.

Explore Your Market →

One-week free trial. Cancel anytime.


Erhan Eren

Ready to uncover market signals like these in your own clean tech niche?
Let Enki Research Assistant do the heavy lifting.
Whether you’re tracking hydrogen, fuel cells, CCUS, or next-gen batteries—Enki delivers tailored insights from global project data, fast.
Email erhan@enkiai.com for your one-week trial.

Privacy Preference Center